Raaj Fittings supplies flanges and pipe fittings to Vietnam from our two manufacturing plants in India: pipe flanges, buttweld fittings, forged fittings and tube fittings in stainless steel, duplex and super duplex, nickel alloys, carbon and alloy steel. We work with EPC contractors, fabricators, stockists and plant owners in Dung Quat, Nghi Son, Vung Tau, the Hai Phong industrial zones and Ho Chi Minh City, for refining, power, offshore oil and gas and manufacturing.
Every order is built around your project specification: the right material grade and standard, full traceability, the documents Vietnam's import rules and your inspector require, and export packing for the voyage from Nhava Sheva, with sea transit of 10–18 days to Cai Mep–Thi Vai or Hai Phong.
Sea shipments are discharged at Cai Mep–Thi Vai, Ho Chi Minh City, Hai Phong, Da Nang, for onward delivery to sites and warehouses in Dung Quat, Nghi Son, Vung Tau, the Hai Phong industrial zones and Ho Chi Minh City. Urgent items can be sent by air freight.
| Service | Typical grades |
|---|---|
| Refining and petrochemicals | A105 / WPB, chrome-moly F5 / F11 / F22, SS 321 / 347, Incoloy 825 |
| Power and steam | ASTM A182 F11 / F22 / F91; A234 WP11 / WP22 / WP91 |
| Hydrocarbon process and sour gas | ASTM A105N / A234 WPB, A350 LF2 / A420 WPL6, F316L / WP316L |
| Water and wastewater | SS 304L / 316L, duplex 2205, coated carbon steel A105 / WPB |
| Port of loading | Nhava Sheva (JNPT), Mumbai |
|---|---|
| Discharge ports | Cai Mep–Thi Vai, Ho Chi Minh City, Hai Phong, Da Nang |
| Indicative sea transit | 10–18 days to Cai Mep–Thi Vai or Hai Phong, subject to the vessel schedule |
| Urgent orders | Air freight |
| Incoterms | EXW, FOB, CFR, CIF or DAP |
Documents include the commercial invoice, packing list, certificate of origin and EN 10204 3.1 / 3.2 certificates; tell us if a specific certificate of origin form is needed for preferential tariffs.
EN 10204 3.2 certificates and inspection by your nominated third-party agency are arranged before dispatch on request. Goods are packed in seaworthy wooden cases, heat-treated and marked to ISPM 15, with end caps or face protectors and VCI protection, and we follow your project's marking, tagging and packing specification.
Sea freight from Nhava Sheva takes 10–18 days to Cai Mep–Thi Vai or Hai Phong, depending on the vessel schedule. Urgent items can be sent by air freight.
We quote EXW, FOB, CFR, CIF or DAP. Many buyers choose CFR or CIF Cai Mep–Thi Vai; DAP to your site or warehouse can be arranged.
Yes. Chrome-moly F11 / F22 / F91 and WP11 / WP22 / WP91 flanges and fittings for steam piping, and carbon steel for balance-of-plant systems.
Yes. Inspection by your nominated third-party agency, witnessing of tests and EN 10204 3.2 certification can be arranged at our plant in India before dispatch.