Raaj Fittings supplies flanges and pipe fittings to France from our two manufacturing plants in India: pipe flanges, buttweld fittings, forged fittings and tube fittings in stainless steel, duplex and super duplex, nickel alloys, carbon and alloy steel. We work with EPC contractors, fabricators, stockists and plant owners in the Fos-Lavéra and Normandy industrial zones, the Lyon chemical valley, Dunkirk and the nuclear fleet across the country, for nuclear power, chemicals, refining and LNG.
Every order is built around your project specification: the right material grade and standard, full traceability, the documents France's import rules and your inspector require, and export packing for the voyage from Nhava Sheva, with sea transit of about 20–30 days to Le Havre or Marseille-Fos.
Sea shipments are discharged at Le Havre, Marseille-Fos, Dunkirk, for onward delivery to sites and warehouses in the Fos-Lavéra and Normandy industrial zones, the Lyon chemical valley, Dunkirk and the nuclear fleet across the country. Urgent items can be sent by air freight.
| Service | Typical grades |
|---|---|
| Chemicals and pharmaceuticals | SS 304L / 316L, 317L, 904L, Alloy 20, Hastelloy C276 |
| LNG and cryogenic service | SS 304L / 316L, A350 LF2 / LF3, A420 WPL6 |
| Power and steam | ASTM A182 F11 / F22 / F91; A234 WP11 / WP22 / WP91 |
| Water and wastewater | SS 304L / 316L, duplex 2205, coated carbon steel A105 / WPB |
| Port of loading | Nhava Sheva (JNPT), Mumbai |
|---|---|
| Discharge ports | Le Havre, Marseille-Fos, Dunkirk |
| Indicative sea transit | About 20–30 days to Le Havre or Marseille-Fos, subject to the vessel schedule |
| Urgent orders | Air freight |
| Incoterms | EXW, FOB, CFR, CIF or DAP |
We supply PED-compliant flanges and fittings when specified, with EN 10204 3.1 / 3.2 certificates. Nuclear-qualified components require project-specific qualification; tell us the code and class at enquiry. For EU imports, tell us your CBAM data requirements and we will advise what information we can provide.
EN 10204 3.2 certificates and inspection by your nominated third-party agency are arranged before dispatch on request. Goods are packed in seaworthy wooden cases, heat-treated and marked to ISPM 15, with end caps or face protectors and VCI protection, and we follow your project's marking, tagging and packing specification.
Sea freight from Nhava Sheva takes about 20–30 days to Le Havre or Marseille-Fos, depending on the vessel schedule. Urgent items can be sent by air freight.
We quote EXW, FOB, CFR, CIF or DAP. Many buyers choose CFR or CIF Le Havre; DAP to your site or warehouse can be arranged.
Nuclear components require qualification to the project code, such as RCC-M. Send the code, class and specification with your enquiry so we can confirm what can be supplied.
Yes. Inspection by your nominated third-party agency, witnessing of tests and EN 10204 3.2 certification can be arranged at our plant in India before dispatch.