Flanges & Pipe Fittings Supplier in the UAE

Flanges, Buttweld, Forged & Tube Fittings for the UAE

Raaj Fittings supplies flanges and pipe fittings to the UAE from our two manufacturing plants in India: pipe flanges, buttweld fittings, forged fittings and tube fittings in stainless steel, duplex and super duplex, nickel alloys, carbon and alloy steel. We work with EPC contractors, fabricators, stockists and plant owners in Abu Dhabi, Dubai, Sharjah and the northern emirates, with sea shipments from Nhava Sheva reaching Jebel Ali in 5–10 days.

UAE projects are specified mostly to ASME and API standards, often with sour-service and seawater requirements, so we build each order around your project specification: the right material grade, NACE MR0175 / ISO 15156 compliance where required, full traceability and the documents your client's inspector will ask for.

Industries We Supply in the UAE

  • Upstream oil and gas: onshore and offshore production in Abu Dhabi, where sour gas makes NACE-compliant carbon steel, duplex and nickel alloy fittings common.
  • Gas processing, refining and petrochemicals: the Ruwais industrial area and gas processing plants use large volumes of carbon, low-temperature carbon and stainless steel flanges and fittings.
  • Desalination and power: seawater reverse osmosis and thermal desalination plants need duplex, super duplex and copper-nickel piping for seawater and brine.
  • District cooling: chilled-water networks in Dubai and Abu Dhabi use large-bore carbon steel buttweld fittings and flanges.
  • Oil storage, terminals and marine: Fujairah and Jebel Ali terminals, ship repair and offshore fabrication yards.

Where We Deliver

Most shipments go by sea to Jebel Ali (Dubai) or Khalifa Port (Abu Dhabi), with deliveries onward to fabrication yards and sites in Musaffah (including ICAD), Ruwais, Jebel Ali Free Zone, Sharjah's Hamriyah and Sajaa industrial areas, and Fujairah. Urgent replacement items can be sent by air freight to Dubai or Abu Dhabi.

Standards Commonly Specified in the UAE

  • Flanges: ASME B16.5 and B16.47 (Series A for most oil and gas work), with RTJ facings in high-pressure upstream service; API 6A for wellhead equipment.
  • Buttweld fittings: ASME B16.9 and MSS SP-75 for high-yield pipeline fittings.
  • Forged fittings: ASME B16.11 socket weld and threaded fittings, MSS SP-97 olets.
  • Materials and testing: ASTM / ASME SA specifications, NACE MR0175 / ISO 15156 for sour service, impact-tested low-temperature carbon steel, and project-specific PMI and hardness testing.
  • Water and utility packages from European contractors sometimes use EN 1092-1 / DIN flanges, which we also supply.

Popular Grades for UAE Projects

ServiceTypical grades
Hydrocarbon process and sour gasASTM A105N / A234 WPB (NACE), A350 LF2 / A420 WPL6, F316L / WP316L
Seawater, firewater and brineDuplex 2205, super duplex 2507 and Zeron 100, copper-nickel 90/10 and 70/30
Severe corrosionInconel 625, Incoloy 825, Hastelloy C276
High temperatureASTM A182 F11, F22 and F91; A234 WP11, WP22 and WP91
InstrumentationSS 316/316L double ferrule tube fittings, duplex and Monel tube fittings

Our Products for the UAE

  • Pipe flanges: weld neck, slip on, blind, RTJ, spectacle blinds and orifice flanges
  • Buttweld fittings: elbows, tees, reducers, caps and stub ends from ½" to 48"
  • Forged fittings: socket weld and threaded fittings, Class 2000 to 9000
  • Tube fittings: double ferrule compression fittings for instrument and hydraulic lines

Shipping from India to the UAE

Port of loadingNhava Sheva (JNPT), Mumbai
Main discharge portsJebel Ali, Khalifa Port, Fujairah, Sharjah
Indicative sea transit5–10 days, subject to the vessel schedule
Urgent ordersAir freight to Dubai or Abu Dhabi
IncotermsEXW, FOB, CFR, CIF or DAP

India and the UAE have a Comprehensive Economic Partnership Agreement (CEPA). If your company wants to claim preferential customs duty under the agreement, tell us when you enquire and we will check whether the products qualify and what documents can be provided.

Documentation, Inspection and Packing

Every shipment travels with a commercial invoice, packing list, certificate of origin and EN 10204 3.1 mill test certificates; EN 10204 3.2 certificates and inspection by your nominated third-party agency are arranged before dispatch on request. For the UAE's heat and coastal humidity, fittings are packed in seaworthy wooden cases, heat-treated and marked to ISPM 15, with end caps or face protectors and VCI protection, and we follow your project's marking, tagging and packing specification.

Frequently Asked Questions

UAE — FAQs

Sea freight from Nhava Sheva to Jebel Ali or Khalifa Port typically takes 5–10 days, depending on the vessel schedule. Urgent items can be sent by air freight to Dubai or Abu Dhabi.

Yes. Carbon steel, low-temperature carbon steel, stainless, duplex and nickel alloy flanges and fittings can be supplied to NACE MR0175 / ISO 15156, with hardness testing and the documentation required for sour service.

We quote EXW, FOB, CFR, CIF or DAP. Many UAE buyers choose CFR or CIF Jebel Ali or Khalifa Port; DAP to your yard or site can be arranged.

Tell us at the enquiry stage if you want to claim preferential duty under the India–UAE Comprehensive Economic Partnership Agreement. We will check whether the products meet its rules of origin and what certificate of origin can be provided.

Yes. Inspection by your nominated third-party agency, witnessing of tests and EN 10204 3.2 certification can be arranged at our plant in India before dispatch.

Request a Quote for Delivery to the UAE

Share your size, pressure class, material grade, standard and quantity — our technical team responds within 24 hours with a competitive quote and full documentation package.
Scroll