Flanges & Pipe Fittings Supplier in The Netherlands

Flanges, Buttweld, Forged & Tube Fittings for The Netherlands

Raaj Fittings supplies flanges and pipe fittings to the Netherlands from our two manufacturing plants in India: pipe flanges, buttweld fittings, forged fittings and tube fittings in stainless steel, duplex and super duplex, nickel alloys, carbon and alloy steel. We work with EPC contractors, fabricators, stockists and plant owners in the Port of Rotterdam industrial area, Chemelot in Limburg, Amsterdam and Den Helder, for refining, chemicals, offshore and distribution.

Every order is built around your project specification: the right material grade and standard, full traceability, the documents the Netherlands's import rules and your inspector require, and export packing for the voyage from Nhava Sheva, with sea transit of about 20–30 days to Rotterdam.

Industries We Supply in The Netherlands

  • Refining and petrochemicals: the Rotterdam cluster, one of Europe's largest.
  • Chemicals: Chemelot and other chemical parks.
  • Offshore and energy transition: North Sea oil, gas and wind, LNG and hydrogen projects.
  • Stockholders and EPCs: Rotterdam-based stockists and contractors distribute piping across Europe.
  • Food and dairy: hygienic processing.

Where We Deliver

Sea shipments are discharged at Rotterdam, Amsterdam, for onward delivery to sites and warehouses in the Port of Rotterdam industrial area, Chemelot in Limburg, Amsterdam and Den Helder. Urgent items can be sent by air freight.

Standards Commonly Specified in The Netherlands

  • EN 1092-1 and EN 10253 for European plants; ASME for refining and offshore.
  • PED 2014/68/EU for pressure equipment.
  • Project specifications for offshore duplex and nickel alloys.

Popular Grades for Netherlands Projects

ServiceTypical grades
Refining and petrochemicalsA105 / WPB, chrome-moly F5 / F11 / F22, SS 321 / 347, Incoloy 825
Chemicals and pharmaceuticalsSS 304L / 316L, 317L, 904L, Alloy 20, Hastelloy C276
Seawater, firewater and desalinationDuplex 2205, super duplex 2507 and Zeron 100, copper-nickel 90/10 and 70/30
LNG and cryogenic serviceSS 304L / 316L, A350 LF2 / LF3, A420 WPL6

Our Products for The Netherlands

  • Pipe flanges: weld neck, slip on, blind, RTJ, orifice flanges and line blanks
  • Buttweld fittings: elbows, tees, reducers, caps and stub ends from ½" to 48"
  • Forged fittings: socket weld and threaded fittings, Class 2000 to 9000
  • Tube fittings: double ferrule compression fittings for instrument and hydraulic lines

Shipping from India to The Netherlands

Port of loadingNhava Sheva (JNPT), Mumbai
Discharge portsRotterdam, Amsterdam
Indicative sea transitAbout 20–30 days to Rotterdam, subject to the vessel schedule
Urgent ordersAir freight
IncotermsEXW, FOB, CFR, CIF or DAP

Documentation, Inspection and Packing

Rotterdam is a common entry point for goods distributed across the EU; tell us whether goods are cleared in the Netherlands or move under bond. We supply PED-compliant products when specified, EN 10204 3.1 / 3.2 certificates on request. For EU imports, tell us your CBAM data requirements and we will advise what information we can provide.

EN 10204 3.2 certificates and inspection by your nominated third-party agency are arranged before dispatch on request. Goods are packed in seaworthy wooden cases, heat-treated and marked to ISPM 15, with end caps or face protectors and VCI protection, and we follow your project's marking, tagging and packing specification.

Frequently Asked Questions

Netherlands — FAQs

Sea freight from Nhava Sheva takes about 20–30 days to Rotterdam, depending on the vessel schedule. Urgent items can be sent by air freight.

We quote EXW, FOB, CFR, CIF or DAP. Many buyers choose CFR or CIF Rotterdam; DAP to your site or warehouse can be arranged.

Yes, Rotterdam is a frequent destination. Goods can be cleared on arrival or forwarded under bond to the final EU destination.

Yes. Inspection by your nominated third-party agency, witnessing of tests and EN 10204 3.2 certification can be arranged at our plant in India before dispatch.

Request a Quote for Delivery to the Netherlands

Share your size, pressure class, material grade, standard and quantity — our technical team responds within 24 hours with a competitive quote and full documentation package.
Scroll