Raaj Fittings supplies flanges and pipe fittings to the Netherlands from our two manufacturing plants in India: pipe flanges, buttweld fittings, forged fittings and tube fittings in stainless steel, duplex and super duplex, nickel alloys, carbon and alloy steel. We work with EPC contractors, fabricators, stockists and plant owners in the Port of Rotterdam industrial area, Chemelot in Limburg, Amsterdam and Den Helder, for refining, chemicals, offshore and distribution.
Every order is built around your project specification: the right material grade and standard, full traceability, the documents the Netherlands's import rules and your inspector require, and export packing for the voyage from Nhava Sheva, with sea transit of about 20–30 days to Rotterdam.
Sea shipments are discharged at Rotterdam, Amsterdam, for onward delivery to sites and warehouses in the Port of Rotterdam industrial area, Chemelot in Limburg, Amsterdam and Den Helder. Urgent items can be sent by air freight.
| Service | Typical grades |
|---|---|
| Refining and petrochemicals | A105 / WPB, chrome-moly F5 / F11 / F22, SS 321 / 347, Incoloy 825 |
| Chemicals and pharmaceuticals | SS 304L / 316L, 317L, 904L, Alloy 20, Hastelloy C276 |
| Seawater, firewater and desalination | Duplex 2205, super duplex 2507 and Zeron 100, copper-nickel 90/10 and 70/30 |
| LNG and cryogenic service | SS 304L / 316L, A350 LF2 / LF3, A420 WPL6 |
| Port of loading | Nhava Sheva (JNPT), Mumbai |
|---|---|
| Discharge ports | Rotterdam, Amsterdam |
| Indicative sea transit | About 20–30 days to Rotterdam, subject to the vessel schedule |
| Urgent orders | Air freight |
| Incoterms | EXW, FOB, CFR, CIF or DAP |
Rotterdam is a common entry point for goods distributed across the EU; tell us whether goods are cleared in the Netherlands or move under bond. We supply PED-compliant products when specified, EN 10204 3.1 / 3.2 certificates on request. For EU imports, tell us your CBAM data requirements and we will advise what information we can provide.
EN 10204 3.2 certificates and inspection by your nominated third-party agency are arranged before dispatch on request. Goods are packed in seaworthy wooden cases, heat-treated and marked to ISPM 15, with end caps or face protectors and VCI protection, and we follow your project's marking, tagging and packing specification.
Sea freight from Nhava Sheva takes about 20–30 days to Rotterdam, depending on the vessel schedule. Urgent items can be sent by air freight.
We quote EXW, FOB, CFR, CIF or DAP. Many buyers choose CFR or CIF Rotterdam; DAP to your site or warehouse can be arranged.
Yes, Rotterdam is a frequent destination. Goods can be cleared on arrival or forwarded under bond to the final EU destination.
Yes. Inspection by your nominated third-party agency, witnessing of tests and EN 10204 3.2 certification can be arranged at our plant in India before dispatch.