Raaj Fittings supplies flanges and pipe fittings to Turkey from our two manufacturing plants in India: pipe flanges, buttweld fittings, forged fittings and tube fittings in stainless steel, duplex and super duplex, nickel alloys, carbon and alloy steel. We work with EPC contractors, fabricators, stockists and plant owners in the Kocaeli industrial belt, İzmir-Aliağa, Istanbul, Mersin and İskenderun, for refining, power, shipbuilding and international EPC contracting.
Every order is built around your project specification: the right material grade and standard, full traceability, the documents Turkey's import rules and your inspector require, and export packing for the voyage from Nhava Sheva, with sea transit of about 20–30 days to Mersin or Istanbul (Ambarlı).
Sea shipments are discharged at Mersin, Ambarlı (Istanbul), İzmit (Kocaeli), Aliağa (İzmir), İskenderun, for onward delivery to sites and warehouses in the Kocaeli industrial belt, İzmir-Aliağa, Istanbul, Mersin and İskenderun. Urgent items can be sent by air freight.
| Service | Typical grades |
|---|---|
| Refining and petrochemicals | A105 / WPB, chrome-moly F5 / F11 / F22, SS 321 / 347, Incoloy 825 |
| Power and steam | ASTM A182 F11 / F22 / F91; A234 WP11 / WP22 / WP91 |
| Shipbuilding and marine | Copper-nickel 90/10 and 70/30, SS 316L, duplex 2205, Monel 400 |
| Pipelines | ASTM A860 WPHY 42 to 70 fittings; A105 / A350 LF2 flanges |
| Port of loading | Nhava Sheva (JNPT), Mumbai |
|---|---|
| Discharge ports | Mersin, Ambarlı (Istanbul), İzmit (Kocaeli), Aliağa (İzmir), İskenderun |
| Indicative sea transit | About 20–30 days to Mersin or Istanbul (Ambarlı), subject to the vessel schedule |
| Urgent orders | Air freight |
| Incoterms | EXW, FOB, CFR, CIF or DAP |
Shipments are cleared by the importer's customs broker with the commercial invoice, packing list, certificate of origin and EN 10204 3.1 / 3.2 certificates. Tell us if PED-equivalent compliance documents are required.
EN 10204 3.2 certificates and inspection by your nominated third-party agency are arranged before dispatch on request. Goods are packed in seaworthy wooden cases, heat-treated and marked to ISPM 15, with end caps or face protectors and VCI protection, and we follow your project's marking, tagging and packing specification.
Sea freight from Nhava Sheva takes about 20–30 days to Mersin or Istanbul (Ambarlı), depending on the vessel schedule. Urgent items can be sent by air freight.
We quote EXW, FOB, CFR, CIF or DAP. Many buyers choose CFR or CIF Mersin; DAP to your site or warehouse can be arranged.
Yes. We supply to ASME, EN and project specifications and can ship directly to project sites in other countries.
Yes. Inspection by your nominated third-party agency, witnessing of tests and EN 10204 3.2 certification can be arranged at our plant in India before dispatch.