Raaj Fittings supplies flanges and pipe fittings to the United Kingdom from our two manufacturing plants in India: pipe flanges, buttweld fittings, forged fittings and tube fittings in stainless steel, duplex and super duplex, nickel alloys, carbon and alloy steel. We work with EPC contractors, fabricators, stockists and plant owners in Aberdeen and the North Sea, Teesside, the Humber, the North West chemical cluster and the nuclear and offshore wind supply chains, for North Sea oil and gas, chemicals, nuclear and utilities.
Every order is built around your project specification: the right material grade and standard, full traceability, the documents the United Kingdom's import rules and your inspector require, and export packing for the voyage from Nhava Sheva, with sea transit of about 20–30 days to Felixstowe or Southampton.
Sea shipments are discharged at Felixstowe, Southampton, London Gateway, Liverpool, Teesport, Immingham, for onward delivery to sites and warehouses in Aberdeen and the North Sea, Teesside, the Humber, the North West chemical cluster and the nuclear and offshore wind supply chains. Urgent items can be sent by air freight.
| Service | Typical grades |
|---|---|
| Seawater, firewater and desalination | Duplex 2205, super duplex 2507 and Zeron 100, copper-nickel 90/10 and 70/30 |
| Hydrocarbon process and sour gas | ASTM A105N / A234 WPB, A350 LF2 / A420 WPL6, F316L / WP316L |
| Chemicals and pharmaceuticals | SS 304L / 316L, 317L, 904L, Alloy 20, Hastelloy C276 |
| Water and wastewater | SS 304L / 316L, duplex 2205, coated carbon steel A105 / WPB |
| Port of loading | Nhava Sheva (JNPT), Mumbai |
|---|---|
| Discharge ports | Felixstowe, Southampton, London Gateway, Liverpool, Teesport, Immingham |
| Indicative sea transit | About 20–30 days to Felixstowe or Southampton, subject to the vessel schedule |
| Urgent orders | Air freight |
| Incoterms | EXW, FOB, CFR, CIF or DAP |
In Great Britain, pressure equipment falls under the Pressure Equipment (Safety) Regulations 2016 (UKCA marking), while Northern Ireland follows the EU Pressure Equipment Directive. Tell us which regime applies to your equipment. We supply EN 10204 3.1 / 3.2 certificates, the commercial invoice, packing list and certificate of origin.
EN 10204 3.2 certificates and inspection by your nominated third-party agency are arranged before dispatch on request. Goods are packed in seaworthy wooden cases, heat-treated and marked to ISPM 15, with end caps or face protectors and VCI protection, and we follow your project's marking, tagging and packing specification.
Sea freight from Nhava Sheva takes about 20–30 days to Felixstowe or Southampton, depending on the vessel schedule. Urgent items can be sent by air freight.
We quote EXW, FOB, CFR, CIF or DAP. Many buyers choose CFR or CIF Felixstowe; DAP to your site or warehouse can be arranged.
In Great Britain, pressure equipment falls under the Pressure Equipment (Safety) Regulations 2016 (UKCA), and Northern Ireland follows the EU Pressure Equipment Directive. Tell us which regime applies; we supply PED-compliant material when specified, with EN 10204 3.1 or 3.2 certificates.
Yes. Inspection by your nominated third-party agency, witnessing of tests and EN 10204 3.2 certification can be arranged at our plant in India before dispatch.